Facebook Instagram Twitter Youtube
  • News
    • Campus
    • Local
    • World
  • Arts and Entertainment
    • Performing Arts
    • Visual Arts
    • Music
    • Film
    • Fashion
  • Lifestyle
    • Campus Happenings
    • Community Happenings
    • Food
    • Business
    • Travel
    • Calendar
  • Opinion
  • Sports
  • Video
    • Globe News
    • What’s Bruin
    • Bruin Lens
    • Film
    • Music
    • Globe Shorts
  • Radio
Search
70.6 F
Salt Lake City
Monday, September 15, 2025
  • Newsletter Signup
  • Contests
  • About The Globe
    • Staff
    • Jobs
    • Issue PDFs
Facebook Instagram Twitter Youtube
Sign in
Welcome! Log into your account
Forgot your password? Get help
Privacy Policy
Password recovery
Recover your password
A password will be e-mailed to you.
The Globe The Globe
The Globe The Globe
  • News
    • Campus
    • Local
    • World
  • Arts and Entertainment
    • Performing Arts
    • Visual Arts
    • Music
    • Film
    • Fashion
  • Lifestyle
    • Campus Happenings
    • Community Happenings
    • Food
    • Business
    • Travel
    • Calendar
  • Opinion
  • Sports
  • Video
    • Globe News
    • What’s Bruin
    • Bruin Lens
    • Film
    • Music
    • Globe Shorts
  • Radio
Home News Campus Past and present combine at South City
  • News
  • Campus
  • Don't Miss

Past and present combine at South City

By
David Bell
-
July 20, 2011
0
Center for New Media Construction on South City Campus
The construction for the New Media Center is being done on schedule. (David Bell)

The construction for the Center for New Media at Salt Lake Community College’s South City Campus is proceeding on schedule and on budget.

Students and faculty are tolerating the construction noise.

The reason for building the Center for New Media is because the different types of media are converging. The entire southeast corner of the campus is being renovated. The cafeteria will be renovated into Salt Lake City School District classrooms and offices. The swimming pool is changing to a two story building with a new library and conference rooms. The gym area will also be renovated into a two story complex with classrooms and labs for the radio and TV.

As with all construction projects there is a considerable amount of noise due to heavy equipment being used, such as backhoes and jack hammers, plus the sound of hammering.

“We are following city ordinances as far as the times that heavy equipment can be used,” Joy Tlou, Director of Public Relations SLCC said.

“It does [the construction] bother me a little bit, the noise and the smell of paint,” Jacob Roth, graphic design student said.

Most students plus the faculty say that the noise is what bothers them about the construction. Other than that there is a wide variety of opinions about the construction.

“I can hear the banging, one Friday it got really bad,” Jesse Wright, open computer lab employee said. “Other than that it’s fun to watch.”

Elise Brummett, who is finishing her generals at South City said, “The noise during class does bother me, and I don’t like how they block doors without telling you.”

Liz Brewster is a faculty member who works in the enrollment office at South City, who has the finish of the project in mind.

“Yes, the noise bothers me, but I’m okay with it because I’m looking forward to the end result,” she said.

The students have had to make some changes because of the construction, for instance the book store had to be moved because the outer wall of the school where it was will be used as a door way out to the New Media Center. All the construction being done to the outside of the campus building is being done on the back south east side. By doing this the school will keep its historic look when driving by on State Street.

“The challenge was to build in the Center for New Media without changing the historic nature of the school,” Tlou said.

The school has a historic nature because it was originally built in the 1930s as a high school.  Salt Lake Community College acquired the campus in the 1980s when enrollment in the school went down far enough that the school could not stay open.

“We were lucky enough to get the site,” Tlou said. “The construction will revitalize the school for decades more.”

The biggest challenge in building the center will be to make sure that the building is correctly wired for all the high tech equipment that will be used. All genres of mass communication will be moved into the New Media Center upon completion in 2013.

  • TAGS
  • center for new media
  • construction
David Bell

RELATED ARTICLESMORE FROM AUTHOR

View from sidewalk of a new home with an open garage door

SLCC students build a new home in West Jordan

Komatsu excavator at the corner of 2100 S and McClelland St.

Reconstruction of 2100 South in Sugar House aims to increase access, safety

Luisana Zambrano hosting Globe News in studio

Globe News: April 11, 2024

Luisana, left, and Teresa giving updates from the news desk

Globe News: Feb. 29, 2024

Clubhouse and training area being constructed near a baseball field

Renovations at SLCC’s baseball stadium finish this week

The Globe
ABOUT US
About The Globe
Staff
Jobs
Issue PDFs
FOLLOW US
Facebook Instagram Twitter Youtube
  • About The Globe
  • Staff
  • Contact Us
  • Jobs
© 2025 The Globe